
Carport. Cement to be repaired and epoxy
coated. Deck posts to be strengthened.
.
Storage Room. This is after it was cleared out, then repacked with everything from upstairs.
.
Basement Entry. To be tiled from stair to front wall all the way across.
.
Basement. Carpet to be added, cabinet removed, new windows and paint.
.
Shower. We are considering a variety of fixes.
.
No comments:
Post a Comment