Sunday, May 11, 2008

The Before Pictures

Exterior of Cabin. The roof will be replaced, the front wall replaced, the dormers repaired, the windows replaced, the exterior doors replaced, the deck reinforced, the concrete in the carport repaired, the propane tank painted, and rock added to the exposed foundation.
.
Exterior. Basement windows to be replaced, the roof replaced, dormers repaired, and rock added to exposed foundation.
.
Side Door. Dormer to be repaired. Possibility of larger door.
.
Basement Door. To be replaced.
.
Deck. Front wall will be moved forward at the corners to the front rib as seen above. Gap in roof will be filled with tongue in groove planks.

No comments: