
The cement fiber shingle siding and trim are going up on the exterior.
..

This is how the shingle siding looks up close. It will be stained later.
.

The interior side of the wall has the tongue-in-groove siding up. It will be stained later also.
.
The kitchen with the faucet now in and some paint samples on the wall. The counter and cabinets are still very dusty.
.
Looking out to the front room/wall.
.
A plant shelf has been placed on top of the wall upstairs. It will be painted soon.
.
The main bathroom with faucet and toilet in place. Sample paint on wall. Dust and trash to be removed at a later date.
.
New shower fixture in place.
.
Upstairs bathroom with faucet and toilet. Drywall to be painted and cabinet trim piece to be added soon.
.