Saturday, August 30, 2008

A Few New Features

The new bath has been tiled.
.
Now the shelf for shampoo is on the bottom.
.
These are the new doors and casings on the main floor.
.
Here are the new doors in the basement.
.
The ceiling of the front room is wired for the chandeliers.
.
Outlet in the floor of the front room.
.
New basement entry. Now slightly wider.
.

Monday, August 25, 2008

Tile Time

The tile has been installed. We are just waiting for grout. When Kristen was asked what color she would like for grout, she said, "dirt." It makes easier to clean I suppose.
.
Here is the kitchen.
.
The hallway looking toward the kitchen from the side door.
.
The basement entry. We actually think we will remove the last row of tiles in order to make more room for the carpet area.
.
Main bathroom.
.
The shower is prepped for vertical tile.
.

Sunday, August 17, 2008

Update

New wider bathtub.
.
Wider tub means smaller space for toilet and vanity.
.
Trim and doors removed. New trim and doors are coming.
.
Remember this floor upstairs. I just remember plopping Kerplunk marbles down the cracks onto Mom and Dad's bed.
.
Upstairs bathroom.

Monday, August 11, 2008

Don't Panic!

Don't Panic! Sometimes things have to get worse before they can get better. In order to improve the kitchen and bathroom they had to be destroyed first.
.
The kitchen is prepped for new cabinets.
.
View of the kitchen looking to the front room.
.
We will have the siding here match the front wall.
.
The shower will no long have the 6 inch shelf digging into your shoulder.
.
The bathroom floor. It looks in pretty good shape. We now need to fit a slightly larger tub, a toilet and a new vanity/sink.
.
The toilet seems to be the only thing that was leaking much, and only just a little.
.

Saturday, August 9, 2008

Possible Lighting

.
The following lights are the current ideas we have for the cabin. We would love your input. Please submit comments and suggestions now or forever hold your peace.
.
Maybe two of these in the front room. We have also considered ceiling fans with lights, but haven't found one we like yet.
.
.
Wall sconce #1.
.
.
Wall sconce #2.
.
.
Wall sconce #3.
.
.
Flush mount. For basement ceiling lights.
.
.
Ceiling light for kitchen.
.
.
Outdoor light. Probably on the deck.
.
.
Outdoor light. Probably two of these in the carport with a motion sensor.
.
Please let us know which wall sconce you like best. Some will be needed in the 3 bedrooms, the wall by the laundry, and the inside front wall. We could use all the same or mix and match. Also, the outdoor lights on the deck and carport could match or be switched.
.

Sunday, July 20, 2008

New Features

New windows seen from the loft.
.
Front view. Stronger support beams seen below the deck.
.
New larger kitchen window.
.
No more fire pit.
.
No more basement cabinets.
.

More Floor Space

New front wall pushed out four feet at the edge.
.
Same side viewed from the loft. Notice the line of the old wall.
.
Same change viewed on the other side.
.
Again, from the loft.
.

Tuesday, July 15, 2008

New Windows

.
The front in progress.
.
There is still siding, paint, etc. that needs to be placed.
.
The windows from the inside.
.
Another view.
.

Saturday, July 12, 2008

Shock and Awe

.
Work is moving along. Here is the new side door and bathroom window.
.
Scott surveys the living room without carpet.
.
Over the years, the gap in the roof over the deck allowed some water damage which will have to be repaired.
.
This shows the area where we will be gaining floorspace in the front room.
..
.
WARNING!!!
ACHTUNG!!!
AVISO!!!
ATTENZIONE!!!.


The following photograph is not for the faint of heart.
..
.
Remarkably, the framers should be close to done with the front windows on Monday.
.